draft notes Field Journal
Vol. 2026 · 16 Jun 2026 · Work IQ

Work IQ · by Susanth Sutheesh · 30 min read

Microsoft Work IQ API — Day-1 Hands-On Walkthrough

↗ a follow-along guide to the Work IQ API GA — admin enablement, the user install, and three real demos, all walked end-to-end on a lab tenant

On this page

Microsoft’s Work IQ API goes generally available on 16 June 2026. Ahead of GA, I walked through every part of it on a lab tenant — both halves. The admin half (one URL + one workaround for the famous AADSTS650052 trap). The user half (four install paths to choose from + the EULA). And three real walkthroughs against a synthetic Project Adventure dataset so you can see what good looks like before you build. This post is the plain-English version of what I learned, structured so any team can follow along on their own tenant.

If you’ve been reading the announcement headlines and wondering “is this another Microsoft Graph?” — the short answer is no, it’s a different shape of API. The long answer is the rest of this post.

I also built two tiny working samples you can fork on Day 1 — a morning brief generator (Node script) and an embeddable web-app (Express + browser UI). Both call Work IQ directly via the A2A protocol. Links + full walkthrough later in this post.

🔄 This is a living document. The AI world changes every day — features roll out, names change, and new capabilities appear. If you spot anything out of date, please send me feedback and I’ll update it. Last verified: 29 September 2026 against Microsoft Learn, Microsoft Licensing, and the microsoft/work-iq GitHub repo.

Part of the Build Your Own Agents guide — Work IQ is the workplace-intelligence layer agent builders can use to ground their applications in Microsoft 365 context.

Quick Links

The Translator Analogy — What Work IQ Actually Is

Imagine you’re a manager in a multilingual company.

Microsoft Graph is the raw transcript service — it hands you every email, calendar event, file, and chat exactly as written. If you want to know who’s the right person to ask about the Q3 deck, you have to read the transcripts yourself, work out who keeps replying to whom, and build a mental picture of who’s actually involved.

Work IQ is the translator who’s been sitting in every meeting for the last two years. You ask “who’s the right person for the Q3 deck?” and you get a person, not a transcript. The translator already understands who collaborates with whom, what Q3 deck means in this tenant, and which meeting was the one where the customer pushed back.

Both layers exist. Both are useful. They do different jobs.

That shape difference is why Microsoft is pitching Work IQ as the recommended foundation for new agent applications on M365 data. Agents are not browser users. They don’t want a paginated list of 500 messages; they want the meaning. Work IQ packages the meaning server-side, before the answer leaves the building.

When to Reach for Work IQ vs Microsoft Graph

The honest follow-up to the translator analogy: “so do I throw Graph away?” No. Pick whichever fits the job in front of you.

ScenarioWork IQMicrosoft GraphWhy
Agent answering an end-user question over their M365 content✅—Server-side context packaging + delegated auth = built for this
Building a Copilot-style “what changed on Project Adventure this week?” surface✅—Chat + Context APIs do the orchestration for you
Scheduled nightly export of mailbox / SharePoint / Teams data—✅Work IQ has no app-only auth — Graph batch jobs are right tool
Sending mail / creating events on a user’s behalf inside an agent flow✅✅Both work; Work IQ Tools (do_action /me/sendMail) keeps your agent on one API surface
Running an unattended back-office automation as a service principal—✅Application-only auth not supported on Work IQ
Building a Teams bot that responds when a user @-mentions it✅—The agent always has a signed-in user context, so Work IQ fits
Pulling Power BI datasets / Intune device records / Defender alerts—✅Outside the M365-content scope Work IQ covers today
Migrating an existing Graph-based assistant to take advantage of Copilot’s reasoning✅ (Chat + Context)✅ (keep your Graph plumbing)Hybrid is normal — most teams will run both for a long time

The pattern: if your agent runs as a signed-in user reasoning over M365 content, start with Work IQ. If your code runs as a service (batch, background, unattended) or touches non-M365 data, stay on Graph. The two are designed to coexist.

What Microsoft Announced, In 12 Plain Words

Microsoft’s announcement, paraphrased: “a workplace intelligence layer that gives agents a real understanding of everything happening across your business — context, relationships, and patterns — so agents can deliver faster, more accurate, more secure responses than connector-only approaches.”

That’s 30 enterprise words. The 12-word version: “the brain that’s behind Copilot is now its own API for your agents.”

That’s the whole thing. Everything else — the four components, the 10 verbs, the three protocols, the Copilot Credits billing — is implementation detail of that single idea.

Microsoft’s pitch comes with four quantitative claims, all from their own internal testing:

ClaimWhat Microsoft says
Data footprintAverage Fortune 500 tenant has 600+ TB of data Work IQ continuously understands
Speed2× faster than traditional APIs in coding harnesses (Microsoft’s benchmark phrasing: “run time per second” — roughly throughput / tokens-per-second)
Efficiency80% fewer tokens used vs traditional APIs in coding harnesses
ScaleArchitected for the high-frequency continuous traffic agents generate, not human-app patterns

These are Microsoft’s published numbers. I’m planning to measure them directionally on my own tenant — the same question asked via workiq ask versus the equivalent raw-Graph chain, with token counts captured on both sides — and update this post with what I see. The architectural reason the gains are plausible is solid: server-side context packaging beats client-side stitching every time, and that’s exactly what Work IQ does.

The Four Components of Work IQ

Work IQ has four parts. Microsoft sometimes calls them “components”, sometimes “domains”, sometimes “layers” — same thing.

ComponentWhat it gives youWhen you’d use it
ChatProgrammatic access to the full M365 Copilot reasoning stack — the answer Copilot would give a user, with citationsYour agent needs an answer, not raw data — same as if a user asked Copilot directly
ContextSame source content Copilot would aggregate for an answer — but returned as agent-ready context blocks, not a synthesized responseYour agent has its own reasoning logic and just wants the grounded context to think with
Tools10 generic verbs against resource paths (Entity tools via Microsoft Graph; Copilot tools invoke M365 Copilot; Schema tools introspect Work IQ’s own path registry)Your agent needs to do things — send mail, create events, upload files — not just read
WorkspacesPer-agent durable scratch space inside the tenant trust boundaryLong-running agents (Microsoft Scout, or any custom agent that needs memory between calls) that need to stash intermediate state without leaking it outside the tenant

Most early Work IQ integrations will combine Context + Tools. Chat is the heaviest call (it does all the reasoning Copilot would). Workspaces is mostly relevant for larger orgs running long-lived agents — only matters if your agent runs longer than a single request/response.

If you want a one-glance picture of how the four components, three protocols, and your code fit together:

flowchart TD
    A["Your agent code"] --> B["Pick a protocol
A2A · MCP · REST"] B --> C["Work IQ"] C --> D["Chat
Copilot answer + citations"] C --> E["Context
Grounding blocks"] C --> F["Tools
10 generic verbs"] C --> G["Workspaces
Per-agent scratch"]

You pick a protocol, call one or more of the four components, and Work IQ does the orchestration into Graph or Copilot for you. Your code never has to wire those parts together itself.

The 10 Verbs — A Jeweller’s Screwdriver, Not An IKEA Box

This is the part of Work IQ that took me longest to get my head around — and the part where the design principle pays off.

Microsoft did not ship 100 specific verbs (sendMail, createEvent, getMessages, uploadFile, …). They shipped 10 generic verbs that compose against resource paths. A jeweller’s screwdriver: a small set of bits that fit a huge variety of screws — not the IKEA box where every part has its own dedicated tool.

The 10, organised by category:

CategoryVerbsWhat they do
Entity toolsfetch · create_entity · update_entity · delete_entity · do_action · call_functionCRUD operations and actions on M365 resources via Microsoft Graph
Copilot toolsask · list_agentsInvoke M365 Copilot for natural-language reasoning · discover available agents
Schema toolsget_schema · search_pathsRuntime introspection — discover available paths and retrieve OpenAPI schemas on demand

The design principle Microsoft repeats every chance they get: fewer tools, more paths. When a new workload ships — say, Loop pages — Microsoft doesn’t need to add a getLoopPage verb. They can add a /me/loopPages resource path. Your agent calls fetch /me/loopPages. The tool surface is designed to stay small while the path catalogue grows.

Two consequences of this design that matter for builders:

  1. Agent prompts get a lot shorter. Instead of teaching the model that sendMail exists, that replyToMessage exists, that forwardMessage exists — you teach it that do_action exists and that it can hit /me/sendMail, /me/messages/{id}/reply, and /me/messages/{id}/forward. The action verbs become resource paths in the prompt, not tools in the registry.
  2. Schema discovery is runtime, not bundled. Your agent doesn’t pre-load thousands of OpenAPI type definitions. It calls search_paths to find what’s available, then get_schema on the specific path it wants. This trades a bit of latency for a huge drop in context tokens — which is exactly where Microsoft’s “80% fewer tokens” claim comes from.

A handful of real invocations to make it concrete:

fetch /me/messages                              → read my emails
do_action /me/sendMail                          → send an email
create_entity /me/events                        → create a calendar event
fetch /me/chats/{id}/messages                   → read Teams chat messages
call_function /search/query                     → semantic search across the tenant
ask "What deals closed this quarter?"           → invoke Copilot reasoning
list_agents                                     → discover available agents
get_schema /me/events                           → OpenAPI for the calendar resource

Setup — The Admin Journey (One URL + One Workaround)

This is the part the IT admin does once for the whole tenant. If you’re not the admin, send this section to whoever is — they need 15 minutes.

Before you begin (admin prereqs) — these are the things the section below assumes you have. If any of them are missing, that’s the first thing to fix:

PrereqHow to check / get it
An admin role — one of: Global Admin, Cloud Application Admin, Application Admin, or Privileged Role Administratorentra.microsoft.com → Identity → Roles & admins → search for your own account
A usage-based billing plan set up in Copilot Studio (Azure subscription + resource group assigned), with the user assigned to the planMicrosoft’s Enable Work IQ guide lists this as a prerequisite — Work IQ API calls are metered in Copilot Credits, so a billing plan has to exist before anyone can call it
Licensing for the surface you plan to useThere is no separate Work IQ API SKU, and reaching Work IQ over A2A / REST / MCP is usage-billed rather than gated on a per-user Copilot licence. Any per-user entitlement question is about the specific connector-backed tools your agent calls, not the API itself — so check the tools, not the transport
Your tenant ID (a GUID — for the consent URL)entra.microsoft.com → Overview · or PowerShell: (Get-AzContext).Tenant.Id
PowerShell 7+ (pwsh), if you hit the AADSTS650052 workaround in Step 2.5pwsh -v should print 7.x. If missing, install from aka.ms/powershell
Git (only if you’ll clone the microsoft/work-iq repo in Step 2.5)git --version — if missing, install Git or just download the script directly from the repo’s web UI
A browser that allows Microsoft pop-up sign-insDefault browsers all work. If your org uses a strict CA policy that blocks pop-ups from PowerShell, see Step 2.5’s -UseDeviceCode option

The whole admin journey, end to end:

  1. Set up a usage-based billing plan and assign the user to it (Work IQ is metered in Copilot Credits)
  2. Click one URL to grant tenant-wide consent
  3. (If needed) run one PowerShell script to unblock a known consent error
  4. Confirm in Entra that the Work IQ CLI app is registered

That’s it. Once those steps are done, users assigned to the billing plan can install the CLI and start querying.

Admin Step 1 — Set up billing, then confirm licensing

This is the part that changed most between preview and GA.

Billing comes first. Work IQ API calls are metered in Copilot Credits, so before anyone can call the API your tenant needs a usage-based billing plan set up in Copilot Studio (with an Azure subscription and resource group assigned), and the user has to be assigned to that plan. Microsoft lists this as a prerequisite in Enable your tenant for Work IQ. No billing plan, no calls — this is the step people miss.

On licensing: Microsoft’s GA licensing page says there is no separate Work IQ API subscription, SKU, or per-user licence for the API charge itself. Learn now describes reaching Work IQ over A2A, REST or MCP as usage-billed, and says that path doesn’t use connector licensing. So the question to answer before rollout isn’t “does our protocol need Copilot licences” — it’s “which of the tools our agent actually calls are connector-backed, and what do those need.” Check the entitlement on the tools, not on the transport.

If some of the tools your agent calls do require Copilot licences, assign them first and allow for propagation. Some tenants can take up to 24 hours before the entitlement is visible everywhere.

Microsoft 365 admin centre on the Licenses page, with the Microsoft 365 Copilot row highlighted by a red outline. Twenty-four of twenty-five seats assigned. Lab tenant shown (Contoso).
Admin centre → Billing → Licenses. The API itself is usage-billed, but if the specific tools your agent calls are connector-backed and need Microsoft 365 Copilot, this is where you check the signed-in users have it assigned.

Open this URL in your browser, replacing the tenant ID with yours:

https://login.microsoftonline.com/{your-tenant-id}/adminconsent?client_id=ba081686-5d24-4bc6-a0d6-d034ecffed87

Sign in as a Global Admin (or Cloud Application Admin, Application Admin, or Privileged Role Admin), click Accept, and you’ve granted tenant-wide consent for the seven delegated Graph permissions Work IQ uses:

PermissionWhat it reads
Sites.Read.AllItems in all SharePoint site collections
Mail.ReadUser mail
People.Read.AllUsers’ relevant-people lists
OnlineMeetingTranscript.Read.AllOnline meeting transcripts
Chat.ReadUser chat messages
ChannelMessage.Read.AllAll Teams channel messages
ExternalItem.Read.AllExternal items (Copilot connectors)
What this consent does NOT grant — for admins worried about scope. The seven Graph scopes listed above are all read-only. On those, Work IQ cannot write to mailboxes, edit calendar events, send mail, modify Teams channels, or change SharePoint content. It cannot read other admins’ mailboxes outside the user’s own delegated permissions. It cannot bypass Conditional Access, DLP, sensitivity labels, or Purview policies — those still apply to every Graph call Work IQ makes on a user’s behalf. It cannot access non-M365 data (Power BI datasets, Intune devices, Defender alerts, third-party SaaS). The consent prompt also includes Work IQ MCP-server scopes beyond these seven (see the dialog below), but any write pathway — the do_action / create_entity Tools — requires the end user’s own delegated permissions at call time and is denied by default until your tenant policy explicitly permits those mutations. The admin consent here doesn’t pre-authorise writes.
Microsoft admin consent prompt for Work IQ CLI showing Microsoft Corporation as verified publisher and a list of more than twenty requested permissions.
The live consent dialog covers the seven Graph scopes plus fourteen MCP-server scopes and "Ask Work IQ agents on behalf of the user" — about twenty-three permissions in total. Worth a heads-up before you click Accept; the live prompt itself is the source of truth on what's being requested.
After clicking Accept the browser shows a 'can't reach this page' error for 127.0.0.1, but the URL bar contains admin_consent=True — which means consent did succeed.
After Accept you get a localhost-refused page — that's normal. The Quick Start URL uses localhost as its callback. Look for admin_consent=True in the URL bar; that's the success signal.

Admin Step 2.5 — The AADSTS650052 trap

Some tenants will see this when clicking the URL above:

AADSTS650052: The app needs access to a service that
your organization has not subscribed to or enabled.
Browser error page after clicking the Quick Start consent URL. The page body says 'Hmmm... can't reach this page' but the URL bar contains the AADSTS650052 error.
Hit this on the Quick Start URL? Don't panic. It just means the script below needs to run first.

This is not your fault. The Work IQ Tools MCP Server resource (and a few related ones — Mail, Calendar, Teams, OneDrive, SharePoint, Word, Admin, Me, M365 Copilot) doesn’t have a service principal auto-provisioned in your tenant. The consent flow assumes they do and stops.

The fix is one PowerShell script:

# Clone the repo first (or download the scripts/ folder)
git clone https://github.com/microsoft/work-iq.git
cd work-iq

# Optional first — read-only check for what's missing
.\scripts\Verify-WorkIQTenant.ps1

# Then the fix — provisions the missing SPs and grants consent
.\scripts\Enable-WorkIQToolsForTenant.ps1

Before you run it, two things you need to know about the script (it’s well-behaved but does talk to your tenant in a few non-obvious ways):

What happensWhat you need
Auto-installs the Microsoft.Graph PowerShell modules from PSGallery if missingSay Yes to the PSGallery trust prompt the first time
Runs Connect-MgGraph partway through with scopes Application.ReadWrite.All + DelegatedPermissionGrant.ReadWrite.AllA browser pop-up appears for admin sign-in. Sign in as a tenant admin
Requires one of: Global Admin, Cloud Application Admin, or Application AdminSign in with an account that holds one of these roles
Auto-disconnects from Graph when doneNothing — clean exit

If you’re on a server / headless box / SSH session where a browser pop won’t work, pass -UseDeviceCode and the script gives you a https://microsoft.com/devicelogin code to enter on any device:

.\scripts\Enable-WorkIQToolsForTenant.ps1 -UseDeviceCode

If your execution policy is Restricted, run with a bypass for the session only:

pwsh -ExecutionPolicy Bypass -File .\scripts\Enable-WorkIQToolsForTenant.ps1

After the script finishes, re-try the consent URL from Admin Step 2 — it’ll go through.

Microsoft Graph Command Line Tools requesting four delegated permissions including manage all delegated permission grants, read and write all applications, maintain access, and view users' basic profile. A 'Consent on behalf of your organization' checkbox is ticked.
The script's own auth prompt. Tick "Consent on behalf of your organization" and Accept. This is the script asking — separate from the Work IQ consent in Step 2.
PowerShell terminal showing the Enable-WorkIQToolsForTenant.ps1 script granting admin consent for multiple MCP servers including SharePoint, Admin, Word, and M365 Copilot, ending with the green message 'Work IQ tenant enablement complete!'
"Work IQ tenant enablement complete!" — what you want to see. Now go re-try the consent URL.
If you’re reading this before clicking the consent URL: just run Enable-WorkIQToolsForTenant.ps1 first. It works whether your tenant needs the workaround or not. Five minutes of friction saved. Heads up on the companion Verify script. The repo ships a read-only Verify-WorkIQTenant.ps1 next to the Enable script. Use Verify first if you want to see what is missing before changing anything. If Verify reports missing service principals or permission grants, run Enable; Enable is idempotent, so re-running it after a partial setup is safe.

Admin Step 3 — Verify in Entra

After consent, head to Microsoft Entra admin centre → Identity → Applications → Enterprise applications. Filter or search for Work IQ CLI. You should see it listed with admin consent granted (the Permissions tab confirms the 7 Graph scopes). The full set of MCP-server-related SPs (Work IQ Tools, Mail, Calendar, Teams, OneDrive, SharePoint, Word, Admin, Me, M365 Copilot) should also be present in the same list — that’s how you know the Step 2.5 script (if you ran it) did its job.

To view this page you need at least Cloud Application Administrator or Application Administrator (read access). Global Admin works too.

Microsoft Entra admin centre search dropdown showing 'Enterprise applications (10)' with the Work IQ CLI, Work IQ Word MCP, Work IQ Calendar MCP, Work IQ Mail MCP, Work IQ Copilot MCP, Work IQ User MCP, Work IQ Teams MCP service principals listed.
A faster way to verify than clicking through menus — type "work iq" in the Entra search bar and you should see all ten service principals grouped under Enterprise applications.

That completes the admin journey. Your users can now install + use Work IQ.

Setup — The User Journey (Pick An Install Path)

Now it’s the user’s turn. Once admin consent is done, every Copilot-licensed user installs Work IQ on their own machine in a few minutes.

Before you begin (user prereqs — the floor below is required no matter which path you pick) —

PrereqHow to check / get it
A work account with a Microsoft 365 Copilot licence assignedAsk your admin · features may take up to 24 hours to appear after assignment
Admin consent already granted for your tenantAdmin journey above must be done first · ask your admin
A browser that allows Microsoft sign-in pop-upsAll major browsers work; you’ll see a Microsoft sign-in page once during EULA acceptance

Each install path below adds its own extras. Pick whichever path matches how you work.

If you already use the GitHub Copilot CLI, this is a three-command setup.

Path A prereqs:

PrereqHow to check / get it
GitHub Copilot subscription (Pro, Business, or Enterprise)github.com/features/copilot
GitHub Copilot CLI installedcopilot --version from any terminal · install via docs.github.com/copilot/github-copilot-cli

Then:

copilot
/plugin marketplace add microsoft/work-iq
/plugin install workiq@work-iq

Restart Copilot CLI (exit then copilot again) and the workiq tool is available inside the same chat surface:

You: What are my upcoming meetings this week?
You: Summarise emails from Sarah about the budget.
You: Find documents I worked on yesterday.
GitHub Copilot CLI showing the /plugin marketplace add microsoft/work-iq command returning an error 'Marketplace work-iq already registered' — meaning Microsoft Scout or a previous install already added it.
Honest-take moment: if you're already on Microsoft Scout, the marketplace is pre-registered. The "already registered" error is fine — just continue to the install command.
GitHub Copilot CLI showing /plugin install workiq@work-iq completing with 'Plugin workiq installed successfully.'
The install is idempotent — runs cleanly whether the marketplace was already there or not.

Path B — VS Code one-click install (GUI-driven, no terminal-typing)

If your daily driver is VS Code (or VS Code Insiders) and you’d prefer a button to click rather than commands to type, Microsoft ships a one-click install badge in the GitHub README.

Path B prereqs:

PrereqHow to check / get it
VS Code 1.99 or later (MCP server support arrived in spring 2026)code --version · code.visualstudio.com
GitHub Copilot extension installed in VS CodeOpen VS Code → Extensions sidebar → search “GitHub Copilot” → Install
Node.js LTS (Copilot uses npx to launch the MCP server under the hood)node --version should print 18 or higher · install from nodejs.org
Browser allowed to open the vscode: protocol handlerFirst time you click the badge, the browser asks permission · click “Open”

Click the “Install in VS Code” badge in the GitHub README — VS Code opens with an MCP install dialog pre-filled. Click Install, and Work IQ is registered as an MCP server in your VS Code workspace. Copilot Chat in VS Code can then call Work IQ as a tool.

There’s an equivalent badge for VS Code Insiders in the same README.

Path C — Autopilot / Microsoft Scout users (already installed)

If you already use Autopilot (the always-on personal agent Microsoft launched as “Scout” on 2 June 2026 and renamed to Autopilot on 25 September 2026), the Work IQ CLI is already bundled in your install. Existing installs may still show the Microsoft Scout name while the rename rolls out.

Path C prereqs:

PrereqHow to check / get it
Autopilot (or Microsoft Scout) installedLook for “Microsoft Scout” (or “Autopilot”) in the Windows Start menu · install via your tenant’s rollout
The CLI shim on PATHOpen a NEW terminal (so it picks up the installer’s PATH change) and run workiq --version

Try this in a terminal:

workiq --version

If the version prints, the CLI is on your PATH — the app ships the same binary the standalone install does. If it’s a pre-GA build (0.4.x / 0.5.x), upgrade to the current GA release before you rely on it — Microsoft only supports GA builds. You still need to workiq accept-eula once (per account) before first use.

If workiq is not found even after an install, the bundled shim lives at %USERPROFILE%\.copilot\bin\workiq.cmd — open a new terminal (or restart your existing one) so the updated PATH takes effect.

Path D — npm global / npx (universal terminal path)

For anyone outside the Copilot CLI / VS Code / Scout world — or anyone who wants the absolute minimum dependencies — npm is the universal path.

Path D prereqs:

PrereqHow to check / get it
Node.js LTS (version 18 or higher)node --version — install the LTS release from nodejs.org if missing
npm + npx on PATH (bundled with Node.js)npm --version and npx --version should both work
Global-install permission (only for the npm install -g flow)On macOS/Linux this usually needs sudo; on Windows the npm install-location is your user folder by default — no admin needed

Then:

# Global install (persistent)
npm install -g @microsoft/workiq

# OR on-demand via npx (always pulls the latest, no install)
npx -y @microsoft/workiq mcp

Works on Windows (x64 + ARM64), Linux, macOS, and WSL. The npx form is what most MCP-aware tools (Claude Desktop, Cursor, etc.) use under the hood when you add Work IQ to their JSON config:

{
  "workiq": {
    "command": "npx",
    "args": ["-y", "@microsoft/workiq", "mcp"]
  }
}

Accepting the EULA (one-time, per user)

Whichever path you picked, before your first query you accept the EULA:

workiq accept-eula

This pops a browser for Microsoft sign-in. Use your work account — the one that has the Copilot licence assigned. Once accepted, your token is cached locally and you don’t see this flow again unless you workiq logout or your tenant invalidates the token.

What can go wrong here, and what to do:

If you see…CauseFix
The browser doesn’t open / nothing happensYou’re on a headless / SSH / remote session OR pop-ups are blockedTry a workstation with a browser, or follow your terminal’s prompt for the device-code URL if it offers one
“AADSTS50058” or “no user signed in”You hit Cancel on the sign-in page, or used a personal Microsoft account by mistakeRe-run workiq accept-eula and sign in with your work account
“User account is not yet provisioned for Work IQ”Admin consent hasn’t been granted for your tenant yet, OR your Copilot licence is still propagating (up to 24h)Wait 24h after licence assignment · ask your admin to verify the Admin Journey was completed
“License required”You don’t have a Copilot licenceAsk your admin to assign Microsoft 365 Copilot to your account

Your first query (the moment it clicks)

workiq --account <your-work-email> ask -q "What's on my calendar this week?" --verbose

Replace <your-work-email> with your full UPN — e.g., [email protected] or [email protected]. If you only have one Microsoft account on this machine, you can drop the --account flag and workiq uses the cached one.

What --verbose adds: the conversation ID and request ID. You can later use workiq debug <conversationId> to generate a shareable diagnostic link — useful when you want to compare what an agent saw across runs, or when you raise a support ticket.

Don’t know your tenant domain? Sign in to outlook.office365.com — the email address in the top-right corner is your UPN. Your tenant domain is everything after the @.

That’s the user journey. Five minutes if you’re on the Copilot CLI plugin path, ten minutes via VS Code, less than that if Scout is already on the box.

Build Something With It — Two Samples + The Repo

Asking Work IQ questions in a CLI is fine, but it’s not why the API exists. The actual point is to build things on top of it — automations, custom UIs, integrations that wire Work IQ into where your team already works.

To make that concrete, here are two small samples (~270 lines total) we shipped to a public repo as Day-1 companion code. Both deliberately stay small so you can read them end-to-end, fork, and adapt:

👉 github.com/susanthgit/aguidetocloud-workiq-samples (MIT, fork away)


Sample 1 — Morning brief generator (morning-brief/)

A 190-line Node.js script that runs once at 8am, asks Work IQ three orchestrated questions, and writes a markdown standup brief to disk:

  • “Summarise everything that’s happened with Project X in the last 7 days”
  • “What’s on my calendar today and tomorrow?”
  • “What commitments have I made that I haven’t followed up on?”

Schedule it with Windows Task Scheduler or cron and you’ve got an auto-generated brief in your inbox every morning — built on top of Work IQ’s agent orchestration, not a single CLI question. The script makes three sequential A2A calls and stitches the results.

VS Code showing the morning brief output as markdown — six themed sections on Project Adventure with bold labels for sources, clean markdown structure, no long URLs and no citation noise.
What the script produces — six themed sections on Project Adventure, clean bold labels for sources, citation noise stripped. The script's cleanForBrief() post-processor handles that — Work IQ's raw output has long Outlook/SharePoint URLs and inline citation markers that look terrible in a markdown file; the cleaner makes them readable.

It’s adaptable. Pipe it into email with nodemailer. Post it to a Teams incoming webhook. Render as HTML and serve. The brief is just markdown — adapt it to your workflow.

Sample 2 — Web-app (web-app/)

A tiny Express server + single-page HTML interface (~270 lines) for asking Work IQ questions in a browser. Demonstrates the embed pattern for adding Work IQ to any internal web app.

The full UX, three screenshots:

Web-app landing state — clean page with a single input field, a green Ask button, and four example chips (today's calendar / project status / open commitments / find specific emails).
Empty state — just an input, four example chips, your account chip in the header.
Web-app showing the loading state — the user's question is pinned in a card with the italic placeholder 'Asking Work IQ...' while waiting for the API response.
When you ask: question pins to the top, answer card shows "Asking Work IQ…" Work IQ A2A typically takes 10–30 seconds — honest about the latency.
Web-app showing a full Project Adventure answer — properly rendered markdown with headers (Overall status / Recent activity / Product delivery direction), clickable links to source items, and citation chips next to claims.
The answer — rendered markdown with sectioned structure, clickable source links, citation chips. All of that comes from the A2A endpoint; the frontend just runs marked + DOMPurify on the response.

The frontend is ~200 lines of vanilla HTML/CSS/JS — no React, no build step. Backend is ~150 lines of Express + MSAL. Multi-turn conversations work via Work IQ’s contextId (the server holds a Map of conversationId → A2A contextId across turns).


The architecture we landed on (and the false starts)

Both samples authenticate via MSAL device-code flow and call the Work IQ A2A REST endpoint directly with a bearer token. Here’s the honest history of how we got there:

TriedWhy we dropped it
workiq CLI subprocess via Node child_process.execCLI’s MSAL auth uses WAM (Windows Account Manager broker), which requires a windowed terminal with a parent HWND. Doesn’t work in any non-GUI shell — legacy PowerShell, SSH session, CI runner, even GitHub Copilot CLI’s embedded terminal. Sub-process inherits the same constraint.
Work IQ MCP server (workiq mcp) as stdio subprocess + JSON-RPCSame WAM auth issue. Also the MCP server in the version we tested didn’t pick up the --account flag or the WORKIQ_ACCOUNT env var — it defaulted to whatever account was last cached locally. On a workstation that’s been signed into multiple Microsoft accounts, that means the agent picks up the last-used tenant unless you explicitly clear the cache. Worth knowing if you’re building for multi-tenant dev workstations.
MSAL device-code → A2A REST (what we shipped)Works in any terminal — device code prints a URL + code, you enter it once in any browser, refresh token cached for ~90 days. Account routing is unambiguous (the token’s UPN claim IS the auth identity). No WAM.

The A2A endpoint lives at https://workiq.svc.cloud.microsoft/a2a/. It speaks JSON-RPC 2.0 with an A2A-Version: 1.0 header. You POST a SendMessage method with a question in the parts[].text, get back a task object with artifacts[].parts[].text containing the answer.

Microsoft Learn now documents a Work IQ REST API as well — and since this post first ran, the REST overview has quietly dropped its preview label. Treat it as a related conversational surface, not a drop-in replacement for everything above: the REST page is focused on multiturn prompts grounded in Microsoft 365 Copilot, while the A2A sample here uses the agent-to-agent JSON-RPC endpoint directly.

Open invitation

These samples are deliberately small + unopinionated. Real production runs would add: retries, structured logging, per-tenant config, secrets management, rate limiting, streaming responses, multi-user OAuth federation. None of that is here. They’re starting points.

If you build something interesting on top of these, send me a link — I’d love to feature what the community builds first.

What It Costs — Copilot Credits Explained

Work IQ API usage is billed through Copilot Credits, a consumption model. Microsoft’s GA licensing page is explicit: there is no separate Work IQ API subscription, SKU, or per-user licence for the API charge itself.

Early GA docs framed this by surface — some pages read as though REST or CLI users each needed a Microsoft 365 Copilot add-on licence. Microsoft has since clarified it (see the September update below), so treat that older per-surface framing as superseded: there’s no separate Work IQ SKU, and the protocol you call Work IQ over doesn’t itself gate on a Copilot licence.

Update, September 2026 — this has firmed up since Day 1, and in a helpful direction. Learn now describes reaching Work IQ through A2A, REST or MCP as usage-billed, and says plainly that this path doesn’t use connector licensing. The entitlement question has moved off the protocol and onto what your agent actually touches: connector-backed Microsoft 365 tools are where a per-user entitlement still matters. The wording I’d use with a customer today is “the API itself is billed by consumption and has no Work IQ SKU — check entitlements for the specific tools your agent calls, not for the protocol you call them over.”

The unit: 1 Copilot Credit = $0.01 USD (source — Microsoft Copilot Studio estimator).

The two cost components:

ComponentPricing shapeWhat you pay for
Tools (the 10 verbs)Fixed per callMicrosoft lists 0.1 Copilot Credits per Work IQ Tool API call. If 1 Copilot Credit = $0.01 USD, that is $0.001 per tool call.
Chat + ContextVariable, scenario-basedMicrosoft has published illustrative per-call ranges — Light $0.20-$0.40, Medium $0.30-$0.75, Heavy $0.50-$1.50 — as a planning guide rather than a rate card. Reconfirm current figures on Microsoft’s pricing page, since the range depends on scenario complexity, grounding, retrieval and reasoning.

The new admin-centre cost dashboard that launched with Work IQ is where this gets manageable:

  • Choose prepaid or pay-as-you-go billing where available
  • Track Work IQ API consumption through Copilot Credits
  • Use spend controls and alerts once your tenant exposes them
  • Reconcile real tenant usage against the public scenario ranges

Work IQ is the first product managed through this dashboard — Copilot Studio and others migrate in over time. If you’ve ever wished M365 admin centre had real cost controls on Copilot consumption, this is the first version of that.

→ Full walkthrough of that dashboard — spending policies, pay-as-you-go vs prepaid vs the P3 pre-purchase, admin roles, and screenshots — is in Microsoft 365 Copilot Cost Management & Billing.

The admin-centre Copilot Credits cost-management surface has now shipped and covers Work IQ — see the Cost Management & Billing guide for the full walkthrough with screenshots.

Plain-English summary on cost:

  • Simple tool actions are cheap at the published 0.1-credit fixed rate.
  • Query-style Chat / Context calls are where cost planning matters, because Microsoft prices them by scenario complexity.
  • The honest planning posture: start with a small pilot, watch real consumption, then formalise budgets.

A worked example — 50-user pilot

Let’s make the abstract concrete. Imagine a 50-user pilot — say, your customer-success team — using a Work IQ-powered agent for a “what’s new on my accounts today?” morning brief each weekday morning. Each brief makes one light Chat / Context-style query plus two Tool API calls. Numbers below use Microsoft’s GA licensing page ranges; verify against your own admin-centre dashboard before budgeting.

Line itemCalculationMonthly estimate
Tools (fixed 0.1 cr / call)50 users × 1 brief × 2 tool calls × 22 working days × 0.1 cr × $0.01$2.20 / month
Chat + Context (Light scenario)50 × 1 brief × 22 working days × $0.20-$0.40$220-$440 / month
Subtotal Work IQ consumptionTools + Light Chat / Context~$222-$442 / month
Microsoft 365 Copilot licences (only if the tools you call need them)50 × current list pricecheck Microsoft pricing
Total planning rangeWork IQ consumption, plus any Copilot licences you actually need~$222-$442 / month + licences

A few honest reads on these numbers:

  • The fixed Tool API charge is tiny. The old pre-GA estimate of 5 credits per tool call was too high; the GA licensing page says 0.1 credits.
  • Chat / Context is the lever. Keep prompts tight, ask for concise outputs, and avoid multi-turn loops unless the workflow needs them.
  • Licences can still dominate — but check before you assume them. If the tools your agent calls need Microsoft 365 Copilot per user, that baseline dwarfs the Work IQ consumption on a small pilot. Microsoft’s own pricing page is the number to quote; list prices move, and they vary by region, tax and agreement.
  • Cap before you scale. Set a low per-user monthly Work IQ spending limit for the first couple of weeks of the pilot. The admin-centre dashboard will tell you whether to relax or tighten before you roll out to the wider org.

What Changes When This Lands — Outlook, Scout, Custom Apps

Work IQ being a layer — not a product end-users open — means the visible changes show up in other Microsoft surfaces over time.

Microsoft Scout — the first Autopilot agent Microsoft announced on 2 June 2026 — builds context powered by Work IQ over time. Per the Scout announcement, Scout “builds context powered by Work IQ, learning how you work, what you care about, and what needs to happen next.” It’s open-source-based (OpenClaw) and lives across Teams, Outlook, OneDrive, SharePoint. When you ask Scout to “block prep time for Thursday’s customer meeting” or “flag any decisions that have been stalled for more than 5 days”, what’s happening underneath is Scout’s reasoning loop calling Work IQ’s Tools, Context, and Chat APIs in a sequence.

Custom apps built by partners and ISVs — every agent platform that supports MCP can now point a tool config at the Work IQ MCP server and gain access to any user’s M365 tenant in a structured way. That includes Claude Desktop, every IDE with MCP support, custom agent frameworks like LangGraph and AutoGen, and any product anyone builds on top of MCP. The bar to integrate is lower than it’s ever been — five lines of JSON config.

Inside the M365 chrome itself — Microsoft signals that more of Outlook’s commitments tracking, Teams’ decision-extraction, OneDrive’s smart-folder behaviour will increasingly be backed by Work IQ as a shared back-end. You won’t see Work IQ as a UI; you’ll see Outlook quietly getting smarter about what you’ve committed to.

What does NOT change — Microsoft Graph is not deprecated. Work IQ is the recommended foundation for new agent applications. For batch jobs, scheduled imports, app-only services, and existing automations that work — stay on Graph. The two coexist for the long haul.

The Honest Limitations

In the spirit of honest > charming, here’s what surprised me on Day 1.

  1. Delegated-only auth is a real constraint. If your existing architecture relies on app-only / unattended-agent / service-principal auth (most batch jobs, most scheduled imports), Work IQ is not for you yet. Microsoft has been clear they don’t support it. This rules out a lot of analytics, reporting, and back-office automation patterns. Use Graph for those.
  2. Licensing wording is still easy to misread. The API has no separate Work IQ SKU, and Microsoft has since clarified that reaching Work IQ over A2A, REST or MCP doesn’t use connector licensing. Be precise with customers: consumption billing doesn’t mean “no entitlement needed anywhere” — it means the entitlement question follows the tools your agent calls, not the protocol you call them over.
  3. The first call is slower than subsequent ones. Semantic-index warmup matters. Build for the warm-path numbers, but flag the cold-path latency to users in any UX where the first query is “instant” expectations.
  4. Agents need to be taught to use the resource-path style. The shift from sendMail-as-tool to do_action /me/sendMail-as-resource-path is genuinely different. Your prompts and your agent system messages need updating. Don’t expect a one-line swap to work out of the box.
  5. REST is documented now, but narrower than the full Work IQ tool surface. REST focuses on multiturn conversational answers grounded in work and web data. It does not support actions like sending emails, scheduling meetings, content generation skills, long-running tasks, or non-text responses.

Top 5 Errors You’ll Hit (And What To Do)

Save yourself the doomscroll. Five errors cover ~90% of the support questions in the first month of using Work IQ. Quick-reference here, full context lives in the relevant sections above.

Error you’ll seeMost likely causeFirst thing to try
AADSTS650052 — “The app needs access to a service…that your org has not subscribed to.” on the admin consent URLThe parent Work IQ service principal (fdcc1f02-fc51-4226-8753-f668596af7f7) isn’t yet provisioned in your tenant — Quick Start consent URL assumes it isRun .\scripts\Enable-WorkIQToolsForTenant.ps1 from the microsoft/work-iq repo. Idempotent — safe to re-run. Then re-try the consent URL. (Full context: Admin Step 2.5)
AADSTS50058 / “no user signed in” on workiq accept-eulaCancelled the sign-in pop / signed in with a personal Microsoft account by mistakeRe-run workiq accept-eula and sign in with the work account that has the Copilot licence assigned
WAM / “user cancelled” on workiq accept-eula inside Copilot CLI, SSH, conhost, or a CI runnerWork IQ MSAL uses WAM (Windows Account Manager), which needs a windowed terminal with a parent HWND it can attach toRun workiq accept-eula from a regular Windows Terminal or PowerShell window first (one-time). Token caches, then any embedded terminal works
workiq ask returns “User does not have access to Microsoft 365 Copilot”Account is signed in correctly but doesn’t have a Copilot licence assignedHave an admin assign a Microsoft 365 Copilot licence in admin.microsoft.com → Billing → Licenses → Microsoft 365 Copilot → Assign licenses
Your MCP-based code picks up the wrong account even though you passed --account user@tenantThe workiq mcp server silently ignores --account and WORKIQ_ACCOUNT env var — defaults to the last-cached account in ~/.workiq/For multi-tenant dev workstations, isolate accounts with $env:USERPROFILE reassignment per session, OR call A2A REST directly (see the samples repo — MSAL device-code per-tenant, no MCP server)

Two general debug tools worth knowing:

  • workiq ask --verbose — prints the conversation ID and request ID; pair with workiq debug <conversationId> to generate a shareable diagnostic link Microsoft support can read.
  • workiq logout — clears the MSAL token cache. Useful when you suspect token staleness.

Where To Go Next

Four doors:

  1. microsoft/work-iq on GitHub — the source for the CLI, ADMIN-INSTRUCTIONS.md, and the Enable-WorkIQToolsForTenant.ps1 script. Star it.
  2. Work IQ overview on Microsoft Learn — canonical conceptual docs, updated frequently.
  3. Work IQ API overview on Microsoft Learn — protocol reference (A2A, MCP, REST) with worked request/response examples.
  4. Work IQ MCP overview on Microsoft Learn — the 10-verbs reference and design principles in Microsoft’s own words.

If you build something on Work IQ and want to compare notes — send me a message. I’m planning a follow-up post measuring real-tenant performance on the 80% / 2× claims, and a deeper dive on the cost-management dashboard once a couple of months of usage data is in.


Sources

Frequently asked questions

Everything I get asked about Work IQ in the first 30 seconds of any conversation.

What is the Work IQ API? #

Work IQ is Microsoft’s workplace-intelligence layer for agents. Instead of agents calling raw Microsoft Graph and stitching together emails, calendar items, files, and chats themselves, they call Work IQ — and Work IQ hands back the pre-digested, permission-trimmed context your agent actually needs. It became generally available on 16 June 2026, after a public preview on GitHub.

How is Work IQ different from Microsoft Graph? #

Microsoft Graph is the raw data plumbing — it gives you the messages, events, files, and members. Work IQ sits on top of Graph and gives you the understanding: who collaborates with whom, what ’the Q3 deck’ actually means in this tenant, which meeting was the one where the customer pushed back. Microsoft says Work IQ uses up to 80% fewer tokens and is 2× faster than traditional APIs in coding harnesses. Those are Microsoft’s own numbers — worth verifying directionally, but the architectural reason is sound: the orchestration work happens server-side before the answer comes back.

Do users still need a Microsoft 365 Copilot licence if Work IQ is consumption-based? #

The cleanest answer today is: Work IQ API usage is consumption-billed, and reaching it over A2A, REST or MCP doesn’t carry connector licensing.

Microsoft Licensing says there is no separate Work IQ API subscription, SKU, or per-user licence; API calls draw down Copilot Credits. Since GA, Learn has firmed this up — the A2A / REST / MCP path is usage-billed and explicitly doesn’t use connector licensing. The entitlement question has moved off the protocol and onto what your agent actually touches: connector-backed Microsoft 365 tools are where a per-user entitlement still matters.

My practical read: budget for Copilot Credits for API usage, and check the entitlement on the specific tools your agent calls rather than assuming one applies to the protocol itself.

If my agent helps 500 employees, do all 500 need a Copilot licence? #

Not necessarily — and this is the bit worth slowing down on. Work IQ still runs as a signed-in human; there’s no “just the agent” mode (no application-only auth, in Microsoft-speak). So if your agent helps 500 people, those 500 are the delegated identities the agent acts under. What they each need depends on the tools your agent calls, not on the protocol you call them over.

Where Copilot entitlements do apply, the maths gets real fast — check Microsoft’s pricing page for current list prices, since they move and vary by region, tax and agreement. Either way: pilot with 30-50 users first, watch the consumption dashboard, then scale.

Who needs to do what — admin vs end user? #

Two distinct journeys. The admin does the one-time tenant work: set up a usage-based billing plan and assign the user to it, click the admin-consent URL, and (if hit by AADSTS650052) run the Enable-WorkIQToolsForTenant.ps1 script from the GitHub repo. That’s the whole admin side, maybe 15 minutes once. End users then install the CLI (Copilot CLI plugin / VS Code one-click / npm global / npx / or just open Autopilot — formerly Scout — if they already use it), run workiq accept-eula, sign in once via the browser pop-up, and start querying. Five to ten minutes per user, one time only.

Can I just use Microsoft Scout instead of installing anything separately? #

If Scout is already installed, you have workiq bundled — try workiq –version in your terminal to confirm. You still need the admin to have granted tenant consent (step 1 of the admin journey) and you still need to run workiq accept-eula once before first use. After that, you can use Work IQ from terminal, from Copilot CLI, OR keep going through Scout — same backend either way.

Can my agent run without a user signed in (app-only auth)? #

No. Work IQ supports Microsoft Entra delegated auth only. On-behalf-of (OBO) flows work, but application-only auth — the pattern most batch jobs and unattended agents rely on — is not supported. Every Work IQ call has to run in the context of a signed-in user. This is the constraint to plan around when migrating existing automation.

How does an admin enable Work IQ for the tenant? #

Open one URL while signed in as a Global Admin (or Cloud Application Admin / Application Admin / Privileged Role Admin), click Accept, and you’ve granted tenant-wide consent for the 7 delegated Graph permissions Work IQ uses. The URL pattern is in the Quick Start at github.com/microsoft/work-iq. If you hit AADSTS650052 / Access Denied, run the Enable-WorkIQToolsForTenant.ps1 script — it provisions the missing service principals that the consent flow assumes are already in your tenant.

What permissions does Work IQ request? #

Seven delegated Microsoft Graph permissions, all read-only: Sites.Read.All, Mail.Read, People.Read.All, OnlineMeetingTranscript.Read.All, Chat.Read, ChannelMessage.Read.All, ExternalItem.Read.All. Plus the underlying MCP-Server service principals (Mail, Calendar, Teams, OneDrive, SharePoint, Word, Admin, Me, M365 Copilot, Work IQ Tools, and related workload servers) — these are scoped per workload. The full list is in the ADMIN-INSTRUCTIONS.md in the GitHub repo and the live consent prompt is the source of truth.

What are the 10 verbs and why only 10? #

Six entity tools (fetch, create_entity, update_entity, delete_entity, do_action, call_function), two Copilot tools (ask, list_agents), and two schema tools (get_schema, search_paths). Microsoft’s design principle is fewer tools, more paths. Instead of growing the tool surface every time a new workload ships, new workloads just expose new resource paths — fetch /me/messages, fetch /me/events, fetch /me/chats — and the same 10 verbs continue to cover them. Agents discover available paths at runtime via search_paths and get_schema instead of pre-loading thousands of type definitions.

Which protocols does Work IQ support? #

Three. Agent-to-Agent (A2A — JSON-RPC over HTTPS, for one agent delegating to another). Model Context Protocol (MCP — local stdio via the workiq CLI, or remote via the hosted Work IQ MCP server, for AI assistants like Copilot CLI, VS Code, Claude Desktop). REST is now documented for multiturn conversations grounded in Microsoft 365 Copilot. Pick whichever fits your agent or app architecture — Microsoft considers them peers, not a layered stack.

What should I watch out for? #

Three things to plan around. (1) Delegated-only auth means no batch / no app-only scenarios — your agent always runs as a user. (2) REST is documented now, but it has its own limits: text responses only, no actions like sending mail or creating meetings, no long-running tasks. (3) Pricing is scenario-based for Chat / Context and fixed for Tools; verify against the Microsoft licensing page and your tenant’s cost dashboard before committing to budgets.

If I already use Microsoft Graph today, should I switch? #

Not all of it — and not in a rush. For the parts of your stack that are an agent reasoning over M365 context, Work IQ is the foundation Microsoft now recommends. For batch jobs, scheduled imports, app-only services, and anything that needs to run without a user — stay on Graph. The two will coexist for a long time.